这又是电源被人给拔了?
444
- sgwyhwt2016-08-31论坛元老81535
This operation was closed at 2016-08-31 04:49:29
Here are the details of this operation:
Electric connector
Date 2016-08-31 04:40:30, karolyne M made Electric connector:
Server was powered off, we restarted it.Server is up, ping ok.
-0-上架新服务器的时候不小心把插头给弄松了??
不过机房那边的处理速度真的快,在monitoring检测的故障后10分钟内处理完